Production

Serica used shared and existing infrastructure to reduce the environmental impact of Columbus

Columbus

BLOCK 23/16f and 23/21a (part)

Serica 50% (operator), Waldorf Production 25%, Tailwind 25%

The Columbus Development is located in the UK Central North Sea and produces from a gas-condensate reservoir in the Forties Sandstone Formation. The development consists of a single horizontal well which runs along the central axis of the reservoir, drilled in the spring of 2021, and production commenced in November 2021.

The Columbus well is connected to the Arran export pipeline through which Columbus production is exported along with Arran Field production.  When production reaches the Shearwater platform, it is separated into gas and condensate.  The gas is exported to St Fergus via the SEGAL line and the condensate to Cruden Bay via the Forties Pipeline System.

Columbus
CNS Locator Map

Columbus

Columbus Development

Columbus development via Shearwater
Careers at Serica
FIND OUT MORE ABOUT CAREERS AT SERICA

Come and join us

READ HERE